Project Details

  • Construction Date

    25/08/2015

  • Location

    Nam Tu Liem - Ha Noi

  • Surface Area

    33.456 m2

  • Construction Investor

    Constrexim No.1 (CONFITECH)

  • Categories:

Project Description

I. Introduction:

1/ Project: Housing Project at Tay Mo Commune, Tu Liem district, Hanoi

2/ The Employer: Constrexim No.1 (CONFITECH) Joint Stock Company

3/ Decision to assign project ownership:
Decision No. 6499/UBND-KH&ĐT on September 18th 2009 issued by Hanoi People Committee in terms of making master plan and implementing “Housing project at Tay Mo commune, Tu Liem district”

4. Approval of Master plan 1/500:
Approval letter No. 384/QHKT-P1 on March 2nd 2009 issued by Hanoi Department of Planning and Architecture for the master plan 1/500 of “Housing project at Tay Mo commune, Tu Liem district”

II. Project site :

Tay Mo commune, Tu Liem district, Hanoi

III.Location on map:

constrexim-du-an-khu-nha-o-tay-mo

Housing project at Tay Mo commune aims at high-end market segment with open architecture and harmonious landscape that is highlighted by green area at the very center of the site. In order to best serve future residents there, the project offers a wide range of facilities from villa, high-rise apartment building, office building, trade center, supermarket, min-market, and kindergarten and entertainment spot.

The project site is just three kilometers from National Convention Center.

Located right at the crossing point of Highway 70 and Lang Hoa Lac Highway – the state-of-art highway connecting a series of satellite areas (An Khanh, Xuan Mai, Hoa Lac) around Hanoi city, it is very convenient to drive from the project site to city centre. In Hanoi city’s master planning orientation that expands to south east, the project shall be interface between Hanoi’s current area and expanded area and among new urban areas themselves. Tay Mo commune stands in the Ring road 3 and Ring road 4 that links Hanoi with other cities such as Hai Phong, Hung Yen, Bac Ninh and Vinh Phuc…

Surrounded by various entertainment destination and universities such Dong Mo golf course, Hai stream, Vietnam ethnic culture village, Ngoc Liep eco-tourism area, Hoa Lac high technology park, Hanoi National university, Van Canh university, the project becomes an ideal living, working and relaxing spot.

Project’s allocation area is as follows:

A. Mixed-use building HH1A và HH1B (at land lot coded HH1):
* Function: department store, office, high-end apartment including 37 floors (4-floor podium) and 2-floor basement.

B. Mixed-use building HH2 (at land lot coded HH2):
* Function: Department store, office including 15 floor (3-floor podium) and 2 floor basement. Floor 1 and 2 is intended as department store and from floor 3 to 15 office area.


C. Villa and garden houses (at land lot coded BT):
* Function: high-end terrace houses with green area and beautiful landscape.