• Location: Ayun Pa town, Gia Lai;
  • Scale:
    – Area of 30ha;
    – Project capacity: 25 MWp;
    – Expected annual power output: 36,000 MWh;
    – Connection voltage level: 110kV;
  • Total investment: 550 billion VND
  • Location: Ham Tan district, Binh Thuan;
  • Scale:
    – Area 34ha;
    – Design capacity: 29.5 MWp;
    – Expected annual power output: 46,000 MWh;
    – Connection voltage level: 110kV;
  • Total investment: 680 billion VND
  • Investor: Southern Confitech Joint Stock Company
  • Location: Binh Duong, Long An
  • Scale: 28 MW
  • Total investment: 532 billion VND

Hotline: +(84)24.3792 0038

Developed by iColor Branding

Connect to Constrexim No.1: