Construction progress of projects in Vinh Long province

1. Radio & VINH LONG PROVINCE:

Project name: Television theater.

Investor: Vinh Long Province Radio and Television Station

Construction contractor: Constrexim No.1 (CONFITECH) JOINT STOCK COMPANY.

Construction location: No. 50 Pham Thai Buong, Ward 4, Vinh Long City, Vinh Long Province.

Existing technical infrastructure: Power supply, water supply, drainage, roads.

Project scale: Grade II civil works, group B.

Construction scale:

+ Building 02 new building blocks of 09-storey office.

+ Construction of 01 new building block of Bridge House with scale of 03 floors.

+ Renovating the existing 07-storey building block.

+ Auxiliary items: Gate, fence, guard house, road yard, water supply and drainage system, external electrical system.

In which category:

  • Category: Block A (09 floors)
  • Category: Block B (09 floors) and building C (Bridge house – 03 floors)

Construction progress: Completed tower A

Updated image of Tower A in November 2019:

Vinh Long Television Tower

Vinh Long Television Tower A

Vinh Long Television Tower A

2. VINH LONG PROVINCE :

Project name: Television Theater.

Investor:  Vinh Long Province Radio and Television Station

Capital: Professional Development Fund of Vinh Long Province Radio and Television Station.

Construction site: No. 50 Pham Thai Buong, Ward 4, Vinh Long City, Vinh Long Province.

Existing technical infrastructure: Power supply, water supply, drainage, roads.

Project scale: Civil works grade II,  group B.

Building Scale:

+ Building a new 03-storey building block including: 600-seat television theater block; Block cinema 03 resistance room 200 seats/room; Studio block 03 auditorium 200 seats/room.

+ Ancillary items: Gates, fences, yards, sidewalks, trees, grass, parking lots for staff and other technical infrastructure items.

Project progress: In progress.

Actual photos in November 2019:

Vinh Long Provincial Theater

3. WORKING BLOCK Vinh Long Provincial People’s Committee:

The working block of the Provincial People’s Committee and general agencies (block 2), was built on an area of ​​​​more than 54,706m2, designed in a concentric circle, 15 floors high with a total floor area. building 31,425m2, by Constrexim No.1 (CONFITECH) JOINT STOCK COMPANY construction.

When the project is completed and put into use, it will serve 465 officials and employees of the Provincial People’s Committee and 6 agencies of the general sector. Total project investment is over 534 billion VND, construction time is about 29 months.

Actual pictures of the building under construction in November 2019: